


Product Specifications
Manufacturer: Flowline
Model Number: UG06 / UG12
Type: Reflective Ultrasonic Level Transmitter
Measuring Range: UG06: 20 cm-6 m; UG12: 45 cm-12 m
Accuracy: Not specified; typical ±0.25% of range
Output: 4-20mA
Technology: Reflective Technology™ for condensing environments
Documents: Product Manual, Product Specs (2 Files)
Product Description
The Flowline EchoPod UG06 and UG12 reflective ultrasonic level transmitters offer continuous level measurement up to 39.3 feet (3m) and feature a 4-20 mA analog signal output. Additionally, configuration of the UG06 and UG12 can be done via WebCal software (free download). What makes this Flowline EchoPod ultrasonic level transmitter stand out is its proprietary Reflective Technology™ which allows for reliable measurement in condensing environments.
The Flowline EchoPod UG06 and UG12 reflective ultrasonic level transmitters can be configured for alarm, automatic fill or empty functions. Common applications for these EchoPod units include day tank, IBC or drum, cooling tower, ski or machine, process tank and waste sumps. Additionally, the UG06 and UG12's Reflective Technology™ make it an ideal fit for small tanks with non-foaming or highly vaporous media such as chemicals, water, wastewater and oil.
WebCal software is a PC utility program that enables users to easily configure and test compatible Flowline level sensors to their measurement and control requirements.
Resources & Documentation
Reflective Ultrasonic Level Transmitter - 39.3ft | Flowline EchoPod UG06 UG12
Product Specifications
Manufacturer: Flowline
Model Number: UG06 / UG12
Type: Reflective Ultrasonic Level Transmitter
Measuring Range: UG06: 20 cm-6 m; UG12: 45 cm-12 m
Accuracy: Not specified; typical ±0.25% of range
Output: 4-20mA
Technology: Reflective Technology™ for condensing environments
Documents: Product Manual, Product Specs (2 Files)
